Fybr Intelligence
The Contractor Evidence Base · contractor register
Demonstration · invented programme & names

The board: every firm, one screen

Grouped by lane, approved first. Load cells: teal within stated capacity, amber beyond, always labelled. Hover a load cell for the firm's record.

Trade
Lane
FirmTrades OriginLoad v capacity Notes

What v1 is, plainly. This board is the register: firms, trades, crews, lanes, load against stated capacity, drawn from documents and direct contact. Live load and reliability scores are v2 fieldwork: a named local researcher and a funded call sheet.

fieldwork pending

The capacity wall: what the register can carry, trade by trade

One row per trade, ordered by the villa starts a month that trade's spare capacity supports, thinnest first. An ordering by one stated figure, not a grading of any trade or any firm.

Firms counted

Capacity is stated per firm, not per trade. A firm working two trades sits in both of its rows, and its spare packages are counted in both. Read one row at a time: the rows do not add up to a programme total.

Firms, trades and crew sizes are public record. Load is as stated. Packages held against stated capacity is what a firm says it is holding, not what has been verified on the ground. That is what the fieldwork chip stands for.

Trade Firms counted
of those on the register
Crew across
the counted firms
Packages held v
stated capacity
Spare
packages
Firms free
within two weeks
Largest firm's share
of stated capacity
Starts a month
the spare supports

A package is the unit. Each trade states how many crew hold one concurrent package, how much of a package one villa start consumes, and how many weeks a package occupies the firm. Those three figures sit under every trade name, and every number in the row is arithmetic on them. Free within two weeks and spare packages measure different things: a firm can state it is free within two weeks while already holding more packages than its stated capacity, and both columns say so.